Public swimming pool: how to do it properly

Constructing a new swimming pool is neither habitual nor simple. Large building firms have real problems when faced with the challenge of constructing a pool. The constant presence of water is a stiff test for the construction materials.

In this section, we invite you to construct a safe and durable public swimming pool, step by step.

1st STEP: how to avoid future leaks in the
wall-plinth joins:
Fuga-Stop 25x18 mm.
2nd STEP: how to bond new concrete with
dried concrete:
Epoxiprim
3rd STEP: how to avoid leaks in the PVC wall-box: SELLADOR S10
4th STEP: carrying out the WATERPROOF TEST:
fill the pool with water for three weeks and
repair all the possible cracks that appear:
 
5th STEP: how to render the walls: Fix-Revoco
6th STEP: how to construct the plinth of the pool's structure:
1st.- apply a bonding paste: PRIMFIX + portland (1:1)
2nd.- apply the mortar:
Recrecem Pre-Mix
7th STEP: how to waterproof the pool's structure: Hidroelastic
8th STEP: how to lay tiles on the waterproofing: Tecnocol Flex
9th STEP: how to grout properly:
grouting that is water-repellent, flexible and resistant to weak acids
Juntatec
10th STEP: allow the shell to dry for 5 - 7 days,
and safely enjoy your new pool.